SAP Testing - In 5 steps

Step one: Providing the Information for a SAP Assessment

The developer, builder or self-builder is responsible for providing the detailed plans and specifications required for the SAP assessment. These are typically prepared by the architect, although this can vary depending on the project.

Providing accurate and comprehensive information as early as possible is essential to ensure the assessment can be carried out efficiently. Unlike an Energy Performance Certificate (EPC) for an existing property, which uses the Reduced Data Standard Assessment Procedure (RdSAP), a full SAP assessment for a new dwelling requires detailed plans and specifications covering the entire property.

The following information is required:

  • Building plans: A site plan showing the dwelling’s orientation, along with floor plans, elevations and sectional drawings.

  • Construction and building services specifications: Details of all construction elements, heating and hot water systems, ventilation, lighting, renewable energy technologies and battery storage, where applicable.

  • Thermal bridging details: Information on the thermal bridges at junctions between building elements, such as where external walls meet floors, roofs and windows.

  • Airtightness target: The proposed air permeability rate for the dwelling.

Once all the necessary information has been collected, it can be reviewed and used to progress to the next stage of the SAP assessment.

Step Two: Planning-Stage SAP Calculations

Local Planning Authorities across the UK may require SAP calculations as part of the planning application process for new-build dwellings. Requirements can vary between local authorities, so it is important to check what documentation is needed for your specific development. In some cases, planning applications may not be validated until the required calculations and supporting documents have been provided. If your Local Planning Authority does not require SAP calculations at this stage, you may be able to proceed directly to the next step.

The initial SAP calculation is carried out using the detailed building plans and specifications provided. Measurements and take-offs are completed from the drawings, and the relevant construction details, materials and building services are entered into SAP 10 assessment software.

The calculation generates key performance figures for the proposed dwelling, which are assessed against the relevant requirements of Part L of the Building Regulations. These include:

  • Dwelling Fabric Energy Efficiency (DFEE): Measures the energy efficiency of the dwelling’s fabric.

  • Dwelling Primary Energy Rate (DPER): Measures the primary energy demand associated with the dwelling.

  • Dwelling Emission Rate (DER): Measures the dwelling’s predicted carbon dioxide emissions.

The proposed design must satisfy all applicable compliance targets. If any of the required targets are not met, amendments may be needed before compliance can be achieved. This could involve improving insulation, specifying more efficient heating and hot water systems, or incorporating renewable energy technologies. The design can then be reassessed to determine whether the necessary standards have been met.

It is also important to understand that Part L includes minimum standards for individual building elements and systems, in addition to overall energy performance targets. These can include requirements relating to wall and floor U-values, heating system efficiency and other aspects of the building’s energy performance.

Once the initial SAP calculation has been completed, the relevant results and supporting documentation can be submitted to the Local Planning Authority, where required. It is essential to check the specific requirements of your local authority and ensure that all necessary forms and supporting information are provided.

Step Three: As-Designed SAP Calculations for Building Regulations

Once planning permission has been granted, the next stage is to work with your Building Control Body to demonstrate that the proposed dwelling meets the relevant Building Regulations requirements.

To demonstrate compliance with Part L of the Building Regulations, which covers the conservation of fuel and power, a SAP calculation must be completed alongside the relevant Building Regulations England Part L (BREL) compliance report. These documents assess the energy performance of the proposed dwelling and provide evidence of compliance at the design stage.

If any changes have been made to the original plans or specifications since the planning-stage assessment, these must be incorporated into the updated SAP calculation. This ensures that the assessment accurately reflects the latest proposed design, including any changes to construction materials, insulation, heating systems, ventilation or renewable technologies.

A Predicted Energy Assessment (PEA) can also be produced and lodged at this stage. A PEA provides an indication of the dwelling’s expected energy performance and is similar to an Energy Performance Certificate (EPC), but it is based on the property’s design rather than a completed building.

If the property is being marketed for sale before construction is complete, the PEA can be used to provide prospective buyers with an indication of its anticipated energy efficiency and running costs.

Step Four: Construction Completion and Evidence Collection

Once the design-stage assessments have been completed, the developer or builder proceeds with the construction of the dwelling. Throughout the build, it is essential to collect evidence demonstrating that the property has been constructed in accordance with the approved design specifications.

This evidence may include photographs of key construction details, insulation installation, thermal bridging junctions and building services, along with relevant commissioning certificates. The photographic evidence requirements are outlined in Appendix B of Approved Document L.

Once the building fabric is complete, an air permeability test must be carried out by a suitably competent person, where required. The resulting air pressure test certificate provides evidence of the dwelling’s airtightness performance and can be used in the final SAP assessment.

Any commissioning certificates and supporting documentation for the heating, hot water, ventilation and other relevant building services systems should also be collected and retained.

Gathering this information throughout the construction process helps ensure that all the necessary evidence is available for the final as-built SAP assessment and demonstrates that the completed dwelling meets the relevant Building Regulations requirements.

​

Step Five: As-Built SAP Calculations and EPC Lodgement

Once construction is complete, a final SAP assessment is carried out to reflect the dwelling as it has actually been built. This assessment takes into account the final construction details, installed materials and building services, together with the measured airtightness results where available and applicable.

It is essential to inform your SAP assessor of any changes made during construction, as these must be reflected in the final calculation. This may include changes to insulation, windows, heating systems, ventilation or renewable energy technologies. The assessor will use the available evidence and supporting documentation to ensure the assessment accurately represents the completed property.

Once the final SAP calculation has been completed and the relevant requirements have been met, an Energy Performance Certificate (EPC) is produced and lodged on the official register. A final Building Regulations England Part L (BREL) report is also prepared, where required, to demonstrate as-built compliance to the Building Control Body.

These final documents provide evidence of the dwelling’s energy performance and help confirm that the completed development meets the applicable Building Regulations requirements.

Mission

EPCSheffield is dedicated to providing comprehensive EPC assessment services in Sheffield, emphasizing the critical role Energy Performance Certificates play in property transactions. We are committed to educating our clients about EPC requirements and advantages while ensuring prompt and reliable service.